Skip to content
ZenoCloud Request A100 quote
NVIDIA A100 80GB capacity

NVIDIA A100 80GB GPU capacity in India.

Monthly A100 80GB capacity for established CUDA training, fine-tuning, inference, analytics and HPC workloads.

₹99,000 per GPU card per month
Monthly price
One allocated A100 GPU card for one month.
System details
Exact variant, card count, host CPU, RAM, storage, network, location and topology.
Compare all GPUs Request A100 quote
Official NVIDIA product render of an A100 SXM accelerator module
Memory
80GB HBM2e
Variants
PCIe or SXM
MIG
Up to 7 instances
Workload
Training and inference
A100 and adjacent monthly GPU prices
GPUMemoryMonthly priceChoose when
L40S 48GB 48GB GDDR6 ECC ₹55,000per GPU card per month Mixed AI and visual compute
A100 80GBCurrent option 80GB HBM2e ₹99,000per GPU card per month Mature Ampere CUDA path
H100 80GB 80GB GPU memory ₹1,80,000per GPU card per month Hopper training and inference
A100 buying questions

Topology matters as much as 80GB.

A100 PCIe and A100 SXM are different system offers. Whole GPU, MIG, VM, interconnect and host resources must be named before two prices can be compared.

Choose A100 whenThe workload is validated on Ampere, 80GB fits the model or training state, and the required PCIe or SXM topology is documented.
Compare H100 whenA measured benefit from Hopper features or throughput justifies changing the accelerator and host topology.
Is this A100 80GB PCIe or SXM?

The public price does not select a variant. The written quote must state A100 PCIe or A100 SXM, card count, interconnect and host system.

Is ₹99,000 for a whole GPU, MIG slice or complete server?

It is the monthly reference price per A100 80GB GPU card. A VM, MIG allocation or complete server is a different commercial unit and must be named separately.

Can two A100 GPUs combine their memory for one model?

Not automatically. Each GPU has its own memory. The framework and topology must partition the model or training state and handle communication between cards.

When should I choose H100 instead of A100?

Choose H100 only when the intended software stack and workload show a useful Hopper benefit. A100 remains a mature path when it already meets the target.

Need an A100 configuration?

Request A100 quote
Quote request

What should we quote?

Describe the configuration or problem, location and timing.

Add company or phone
Replies go to your work email. Add a phone number only if you want a call.