Skip to content
ZenoCloud Request B200 quote
NVIDIA B200 180GB capacity

NVIDIA B200 180GB GPU capacity in India.

Monthly B200 180GB software-visible capacity for qualified Blackwell training and inference workloads.

₹4,59,000 per GPU card per month
Monthly price
One B200 allocation reported as 180GB by the supplied environment for one month.
System details
HGX or DGX system, GPU count, CPU, RAM, storage, network, location and topology.
Compare all GPUs Request B200 quote
Official NVIDIA product render of an HGX B200 eight-GPU platform
Memory
180GB software-visible class
Platform
HGX / DGX class
Generation
Blackwell
Workload
Large training and inference
B200 and adjacent monthly GPU prices
GPUMemoryMonthly priceChoose when
H100 80GB 80GB GPU memory ₹1,80,000per GPU card per month Hopper training and inference
H200 141GB 141GB HBM3e ₹2,20,000per GPU card per month Memory-bound serving
B200 180GBCurrent option 180GB class ₹4,59,000per GPU card per month Blackwell system workloads
B200 buying questions

The system matters more than the model badge.

B200 is an HGX/DGX-class offer, not a generic PCIe card. Software support, topology and the purchased unit must be confirmed before the price is useful.

Choose B200 whenThe workload can use Blackwell and the exact HGX or DGX topology, software stack and 180GB software-visible class are material.
Compare H200 whenHopper and 141GB already meet the workload requirement without the additional Blackwell system commitment.
Why do some sources describe B200 as 192GB?

NVIDIA material uses both 180GB and 192GB labels. ZenoCloud uses the sourced 180GB software-visible class and the written quote identifies the exact system and reported memory.

Is ₹4,59,000 for one B200 or an eight-GPU node?

It is the monthly reference price per allocated B200 GPU card. A complete HGX or DGX node is a separate system quote.

Is B200 the same as GB200 NVL72?

No. B200, GB200 and GB200 NVL72 describe different accelerator and system products. This page does not represent an NVL72 system.

When should I choose H200 instead of B200?

Choose H200 when 141GB Hopper capacity and its supported topology meet the workload. Choose B200 only when Blackwell capability and the exact sourced system are material.

Need a B200 configuration?

Request B200 quote
Quote request

What should we quote?

Describe the configuration or problem, location and timing.

Add company or phone
Replies go to your work email. Add a phone number only if you want a call.